- GAEC Overview: Who Governs It and What It Actually Tests
- Experience Requirements Under the 2026 Licensing Law
- Application Documents and Fees
- Exam Format, Approved References, and Scoring
- Domains That Carry the Most Weight
- After You Pass: Renewal and Continuing Education
- Mapping Study Time to Requirements
- Frequently Asked Questions
- Standard path requires four years full-time electrical experience, with two years on three-phase systems.
- Application fee is $110; exam has 140 scored questions plus 22 unscored beta items across two 4-hour parts.
- Passing requires a scaled score of 70; two failures trigger a mandatory Board-approved review course.
- Class II Unrestricted has no scope limits once licensed - broadest electrical contracting authority in Georgia.
GAEC Overview: Who Governs It and What It Actually Tests
The Georgia Electrical Contractor License Exam (Class II Unrestricted) - referred to on this site as GAEC - is the credential exam that lets an individual hold an unrestricted electrical contracting license in Georgia. It is governed by the Georgia State Board of Electrical Contractors, which sits inside the Georgia Construction Industry Licensing Board, and the exam itself is administered through PSI's testing network. If you're still getting oriented, our overview articles on what GAEC is and what the GAEC acronym means are good starting points before you dig into eligibility mechanics.
Unlike a Class I restricted license, Class II Unrestricted carries no scope limitations - it authorizes work across the full range of electrical installation, alteration, and repair activity covered under Georgia's licensing law. That breadth is exactly why the eligibility bar is higher: more years of documented experience, a heavier three-phase requirement, and a two-part exam that spans ten distinct content domains.
Experience Requirements Under the 2026 Licensing Law
Under the licensing law effective July 1, 2026, the standard experience pathway to sit for the Class II Unrestricted exam requires four years of full-time electrical experience. Within that four-year total, candidates must have accumulated at least two years installing, altering, or repairing three-phase systems. This isn't a minor footnote - three-phase work shows up throughout the exam, particularly in domains covering rotating equipment and transformers, so it's worth treating that experience requirement as a preview of exam content rather than just a box to check.
Beyond the standard four-year path, Georgia also recognizes:
- Education-based credit toward the experience requirement for candidates who completed relevant formal electrical education programs.
- U.S. Department of Labor-approved apprenticeship pathways, which allow structured on-the-job training hours to count toward eligibility.
Whichever path applies to you, the Board will expect it to be verifiable - vague job history won't satisfy the documentation review described below.
Why Three-Phase Experience Is Non-Negotiable
The two-year three-phase minimum exists because Class II Unrestricted licensees are expected to handle commercial and industrial-scale work, not just residential circuits. Candidates who only have single-phase residential experience often underestimate how much of the exam - especially Domain 7 (D-C and A-C Rotating Equipment) and Domain 8 (Transformers) - assumes hands-on three-phase familiarity.
- Document three-phase hours separately if your employer records don't split them out automatically
- Ask supervisors for affidavits that specifically reference three-phase system work
Application Documents and Fees
The current licensure-by-examination application fee is $110. That fee covers processing of your application file, not the PSI testing fee, so budget for both when planning your timeline. For a full cost breakdown across the entire licensing process, see our GAEC Certification Cost breakdown.
Along with the fee, your application packet needs to include:
- Work-experience documentation - detailed records showing dates, employers, and the nature of electrical work performed.
- Affidavits or references - typically from supervisors or licensed contractors who can attest to your hands-on experience.
- Identity and lawful-presence documents - standard verification required by Georgia licensing boards.
- Background check - part of the standard vetting process before exam approval is granted.
Key Takeaway
Gather affidavits and experience documentation months before you plan to apply. Missing or vague paperwork is one of the most common reasons applications stall, and delays push back your one-year exam approval window before you've even sat for the test.
Exam Format, Approved References, and Scoring
Once approved, candidates sit for a computer-based exam consisting of 140 scored multiple-choice questions plus 22 unscored beta questions that PSI uses to evaluate future exam content. The exam is split into two 4-hour parts, meaning this is a full-day commitment, not a quick certification quiz.
Passing requires a final scaled score of 70. Because the exam is open book, success depends heavily on how well you can navigate your approved references under time pressure - not just what you've memorized. Approved reference materials may have permanent tabs, highlighting, and underlining, but handwritten notes are prohibited. A silent, nonprogrammable calculator is permitted for load calculations and sizing problems.
| Exam Element | Detail |
|---|---|
| Scored questions | 140 multiple-choice |
| Unscored beta questions | 22 |
| Time structure | Two parts, 4 hours each |
| Passing score | 70 (scaled) |
| Reference format | Open book, approved references only, tabs/highlighting allowed, no handwritten notes |
| Calculator | Silent, nonprogrammable |
Exam approval is valid for one year from the date it's granted, so plan your study and scheduling within that window. If you fail twice, Georgia requires completion of a Board-approved review course before you can attempt the exam again - another reason to prepare thoroughly rather than treat the first attempt as a trial run. For a deeper look at how tough this exam actually is relative to other contractor exams, read How Hard Is the GAEC Exam?, and for the exact scoring mechanics behind that 70, see GAEC Passing Score 2026.
Domains That Carry the Most Weight
Eligibility gets you to the testing center, but understanding the exam blueprint determines whether you pass. GAEC's content is organized into ten domains, weighted by how much of the exam they represent:
Domain 9: Install and Maintain Interior Electrical Systems (16.43%)
The single largest domain on the exam. Candidates should be fluent in interior wiring methods, circuit protection, and system installation standards, since this domain alone accounts for roughly one-sixth of your scored questions.
Domain 8: Install, Size, and Maintain Transformers (15%)
Transformer sizing and installation ties directly back to the three-phase experience requirement discussed earlier - this is not an abstract theory domain, it reflects real fieldwork.
Domain 10: Special Equipment, Conditions, and Locations (15%)
Covers scenarios outside standard interior wiring - hazardous locations, specialized equipment installations, and unique environmental conditions that require adapted procedures.
Rounding out the blueprint: Domain 7 (D-C and A-C Rotating Equipment, 11.43%), Domain 6 (Electrical Controls and Devices, 10.71%), and Domain 5 (Basic Electrical Circuits, 10%) together make up nearly a third of the exam. The remaining domains - Comply with Laws (7.14%), Comply with Regulations (6.43%), Comply with Administrative Requirements (4.29%), and Plan and Organize Work (3.57%) - carry lighter weight individually but still appear across dozens of questions combined.
For a domain-by-domain breakdown with study guidance for each of the ten areas, see our GAEC Exam Domains Guide.
After You Pass: Renewal and Continuing Education
Passing the exam and securing your license isn't the finish line - Class II Unrestricted licenses renew by June 30 of even-numbered years. Each renewal cycle requires 8 continuing-education hours, which must be reported through CE Broker. Mark this renewal cadence on your calendar as soon as you're licensed, since missing the biennial deadline can complicate your active status.
Mapping Study Time to Requirements
Given the domain weights above, it makes sense to structure preparation around the exam blueprint rather than studying topics in random order. A simple way to sequence your final weeks before test day:
Heavy-Weight Domains
- Interior Electrical Systems (16.43%) and Transformers (15%)
- Build familiarity navigating these sections in your approved reference material
Rotating Equipment, Controls, and Circuits
- Domains 7, 6, and 5 combined represent nearly a third of the exam
- Practice calculations using only a silent, nonprogrammable calculator
Special Equipment and Administrative Domains
- Special Equipment, Conditions, and Locations (15%)
- Laws, Regulations, Administrative Requirements, and Planning domains
Full-Length Timed Practice
- Simulate the two 4-hour parts under real time constraints
- Practice tabbing and referencing your approved materials quickly
For a more detailed study methodology tailored specifically to this exam's open-book format and question style, see our GAEC Study Guide. And if you want a quick-reference summary of core facts to keep handy in the final days before your test, the GAEC Cheat Sheet condenses the essentials into one page.
Once you feel ready to test your knowledge under realistic conditions, you can start practicing directly on our GAEC practice test platform, which mirrors the domain weighting and question style described above rather than generic electrical trivia.
Who This License Opens Doors With
Because Class II Unrestricted has no scope limitation, licensed contractors are positioned to bid on and manage a wider range of commercial, industrial, and residential electrical projects than a restricted license allows. Employers and general contractors specifically seek out unrestricted license holders for larger-scope work where three-phase systems, transformers, and special equipment installations are routine, not occasional. If you're weighing whether the investment of time and documentation is worth it relative to your career goals, our articles on GAEC earnings potential and whether GAEC certification is worth it walk through that decision in more depth, and GAEC Jobs outlines the kinds of roles that typically require this license.
Key Takeaway
Eligibility documentation and exam preparation should happen in parallel. Start gathering affidavits and experience records the same month you begin serious domain-by-domain study - both processes take longer than most candidates expect.
Frequently Asked Questions
Under the licensing law effective July 1, 2026, the standard path requires four years of full-time electrical experience, including at least two years specifically installing, altering, or repairing three-phase systems. Education and Department of Labor-approved apprenticeship pathways can also count toward this requirement.
The $110 fee is the licensure-by-examination application fee charged for processing your eligibility application with the Georgia State Board of Electrical Contractors. It is separate from any testing fees charged by PSI when you schedule your exam.
The GAEC exam is open book using only approved references. You may use permanent tabs, highlighting, and underlining in those references, but handwritten notes are prohibited. A silent, nonprogrammable calculator is also permitted.
After two failed attempts, Georgia requires you to complete a Board-approved review course before you're allowed to sit for the exam again. Your original exam approval is also only valid for one year, so plan your attempts within that window.
Licenses renew by June 30 of even-numbered years. Each renewal cycle requires 8 continuing-education hours, which must be reported through CE Broker before your renewal deadline.